 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Industry and Engineering
In production, the greatest demands are placed on the flexibility, functionality and building management system of industrial buildings. The right light in manufacturing and assembly bays as well as warehouses and workshops is the basis for any productive work.
|
|
 |
 |
 |
 |

|
ASEAG, Aachen/D
|
 |
 |
| Client: |
ASEAG Verkehrsbetriebe, Aachen/D |
| Architect: |
/ |
| Lighting solutions: |
SCUBA moisture-proof batten luminaires, RESCLITE emergency luminaires |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Parker Hannifin, Bielefeld/D
|
 |
 |
| Client: |
Parker Hannifin GmbH & Co.KG, Bielefeld/D |
| Architect: |
Robert Wiehofsky, Podufal + Wiehofsky, Löhne/D |
| Lighting solutions: |
TECTON continuous-row lighting system, SCONFINE Linea pendant luminaires, SLOTLIGHT light lines, PANOS Q downlights, MELLOW LIGHT IV recessed luminaires |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
ZF Getriebe Werke, Saarbrücken/D
|
 |
 |
| Client: |
ZF-Getriebe, Saarbrücken/D |
| Architect: |
/ |
| Lighting solutions: |
TECTON continuous-row lighting system, MIREL recessed luminaires |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Storenmaterial AG, Geroldswil/CH
|
 |
 |
| Client: |
Storenmaterial AG, Geroldswil/CH |
| Architect: |
/ |
| Lighting solutions: |
TECTON continuous-row lighting system, MELLOW LIGHT IV surface-mounted luminaires, PERLUCE diffuser luminaires, PANOS downlights |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Trumpf Maschinen, Pasching/AT
|
 |
 |
| Client: |
Trumpf Maschinen Austria GmbH & Co. KG, Pasching/AT |
| Architect: |
Dipl. Ing. Deschka GmbH, Giesshübl/AT |
| Lighting solutions: |
Production facilities: Tecton 2/80W continuous-row lighting system , Offices: Mellow Light IV surface-mounted and recessed luminaires , Indoor circulation areas: Panos downlights , Restaurant and catering areas: Panos Q downlights, Cardan Spirit recessed and |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Punching factory, Unterentfelden/CH
|
 |
 |
| Client: |
Stanzwerk AG, Unterentfelden/CH |
| Architect: |
|
| Lighting solutions: |
Scuba with internal reflector , Tecton 2*58 W with reflector, heavy-duty electronic ballasts, Slotlight, Onlite Ecosign, Onlite CPS |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Kramer Allrad, Pfullendorf/DE
|
 |
 |
| Client: |
Wacker Neuson Baumaschinen GmbH, Linz/AT |
| Architect: |
Architekturbüro Letzbor, Linz/AT |
| Lighting solutions: |
Tecton continuous-row lighting system - 2x80W T16 LDE WH, Tecton continuous-row lighting system - 2x49W T16 LDE WH, , Scuba clean-room luminaire, Comsign, Ecosign, Puresign, Cubesign escape sign luminaires |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Water treatment plant, Hermalle sous Argenteau/BE
|
 |
 |
| Client: |
A.I.D.E, St.Nicolas/BE |
| Architect: |
Atelier d’Architecture de Lavaux s.c.r.l., Esneux/BE |
| Lighting solutions: |
Damp rooms: FZ moisture-proof luminaire 2/58 W, Retail area/presentation: Copa D high-bay reflector luminaire, Bar: Miros projector-mirror system, Outdoor areas by Thorn Lighting |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
District Heating Plant, Klausen/IT
|
 |
 |
| Client: |
Fernheizwerk, Klausen/IT |
| Architect: |
Dr. Arch. Roland Baldi, Bozen/IT |
| Lighting solutions: |
Copa A, Light Fields, Chiaro, Slotlight |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Nike Logistics Centre, Laakdal/BE
|
 |
 |
| Client: |
Nike Europe, Vorst-Laakdal/BE |
| Architect: |
Signum NV, Sint Denijs-Westrem/BE |
| Lighting solutions: |
Tecton mit ST-Reflektor, Claris II, Panos, Mildes Licht IV, Ledos |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Esse 7 landmark, Hamburg/DE
|
 |
 |
| Client: |
Norddeutsche Affinerie, Hamburg/DE |
| Architect: |
idea architekten, Hamburg/DE |
| Lighting solutions: |
16 engines 150W HIT / DMX , 8 Stck. 41 m PMMA, 14 mm side radiating, 8 Stck. 51 m PMMA, 14 mm side radiating |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Airbus, Bremen/DE
|
 |
 |
| Client: |
EADS Airbus Deutschland GmbH, Werk Bremen/DE |
| Architect: |
Ralf Heuer, Bremen/DE |
| Lighting solutions: |
COPA I with projector-mirror system RAB |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Rolls-Royce Motor Cars Ltd., Goodwood/GB
|
 |
 |
| Client: |
Rolls-Royce Motor Cars Ltd., Chichester/GB |
| Architect: |
Grimshaw, London/GB |
| Lighting solutions: |
TECTON continuous row luminaire, ZX flexible lighting system, MIROS projector-mirror system, LIGHTTOOLS lighting system, FZ/FT moisture-proof diffuser luminaire |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Boehringer, Ingelheim/DE
|
 |
 |
| Client: |
Albert und Helene Boehinger Unterstützungskasse GmbH, Ingelheim/DE |
| Architect: |
Beucker Maschlanka und Partner, Düsseldorf/DE |
| Lighting solutions: |
CLARIS pendant luminaire |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Mellau fire station, Mellau/AT
|
 |
 |
| Client: |
Gemeinde Mellau Immobilienverwaltungs GmbH&Co KEG, Mellau/AT |
| Architect: |
Dietrich/Untertrifaller Architekten, Bregenz/AT |
| Lighting solutions: |
SLOTLIGHT recessed luminaire, ZX flexible lighting system, RAIN moisture-proof luminaire, FZ moisture-proof luminaire |
|
 |
 |
 |
 |
 |
 |
 |
 |

|
Strobl Bau, Weiz/AT
|
 |
 |
| Client: |
Strobl Bau GmbH, Weiz/AT |
| Architect: |
Fuhrmann & Partner Ingenieurbüro Handels GmbH, Graz/AT |
| Lighting solutions: |
ML4 AB 2/54 LDE, PANOS 2x26W TC-DEL, COPA A 1/400W, MIROS projector-mirror system, STARFLEX starry sky |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
Further references
Lagermax, Salzburg/AT
Gläserne Manufaktur, Dresden/DE
Aargauer Zentralmolkerei, Suhr/CH
|
 |
 |
 |
 |
 |
 |
 |